Commit Graph

10 Commits

Author SHA1 Message Date
99bc975a2c docs(03-01): complete annotation completeness plan 2026-02-11 19:05:56 +08:00
ffb4963d2b docs(phase-02): complete phase execution 2026-02-11 18:28:13 +08:00
a0388cf4e1 docs(02-02): complete gnomAD evidence layer integration plan
- DuckDB persistence: gnomad_constraint table with CREATE OR REPLACE (idempotent)
- CLI evidence command: usher-pipeline evidence gnomad with checkpoint-restart
- Provenance tracking: records processing steps, saves sidecar JSON
- Query helpers: query_constrained_genes validates GCON-03 interpretation
- 12 integration tests: end-to-end pipeline, checkpoint, provenance, CLI
- Phase 2 complete: Evidence layer pattern established for future sources
- Duration: 4 min, 2 tasks, 5 files, 70 tests passing

Phase 2 (Prototype Evidence Layer) complete.
2026-02-11 18:23:32 +08:00
c6198122ac docs(02-01): complete gnomAD constraint data pipeline plan 2026-02-11 18:16:35 +08:00
34437fdf0a docs(phase-01): complete phase execution
Phase 1 (Data Infrastructure) verified: 5/5 must-haves, 12/12 artifacts,
9/9 key links, 7/7 requirements satisfied. All 4 plans executed across
3 waves with 49 tests passing.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 16:50:30 +08:00
102dcdbe84 docs(01-04): complete CLI integration and end-to-end testing plan
- CLI entry point with setup and info commands
- Full infrastructure integration verified
- 6 integration tests with mocked APIs
- Phase 01 Data Infrastructure complete
2026-02-11 16:45:12 +08:00
e29d39d1dc docs(01-02): complete gene ID mapping and validation plan
- Gene universe definition with mygene protein-coding gene retrieval
- Batch Ensembl->HGNC+UniProt mapping with edge case handling
- Validation gates with configurable success rate thresholds
- 15 comprehensive tests with mocked API responses
2026-02-11 16:35:57 +08:00
92322b1d7c docs(01-03): complete DuckDB persistence and provenance tracking plan
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 16:34:00 +08:00
9ee3ec2e84 docs(01-01): complete project scaffold and config system plan
- Created comprehensive SUMMARY.md with all execution details
- Updated STATE.md: 1/4 plans in phase 1 complete, 16.7% overall progress
- Documented deviation (venv creation) and decisions
- Verified all files and commits exist (self-check passed)
2026-02-11 16:28:03 +08:00
f80f384a61 docs: create roadmap (6 phases) 2026-02-11 15:47:36 +08:00