docs(05-03): complete CLI report command plan
- Create 05-03-SUMMARY.md with comprehensive execution report - Update STATE.md: Phase 5 complete (3/3 plans), progress 90% (18/20) - Record decisions: CLI pattern, configurable thresholds, skip flags, graceful degradation - Document deviations: 2 auto-fixed bugs (tier threshold format, parameter name) - Update metrics: Phase 05 total 12 min (4.0 min/plan avg) - All tests pass (9/9 CliRunner integration tests)
This commit is contained in:
@@ -10,17 +10,17 @@ See: .planning/PROJECT.md (updated 2026-02-11)
|
||||
## Current Position
|
||||
|
||||
Phase: 5 of 6 (Output & CLI)
|
||||
Plan: 2 of 3 in current phase (plans 05-01, 05-02 complete)
|
||||
Status: Phase 5 in progress — 05-02 complete
|
||||
Last activity: 2026-02-11 — Plan 05-02 executed and verified
|
||||
Plan: 3 of 3 in current phase (plans 05-01, 05-02, 05-03 complete)
|
||||
Status: Phase 5 complete — 05-03 complete
|
||||
Last activity: 2026-02-11 — Plan 05-03 executed and verified
|
||||
|
||||
Progress: [█████████░] 85.0% (17/20 plans complete across all phases)
|
||||
Progress: [█████████░] 90.0% (18/20 plans complete across all phases)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 17
|
||||
- Average duration: 5.0 min
|
||||
- Total plans completed: 18
|
||||
- Average duration: 4.9 min
|
||||
- Total execution time: 1.5 hours
|
||||
|
||||
**By Phase:**
|
||||
@@ -31,17 +31,17 @@ Progress: [█████████░] 85.0% (17/20 plans complete across al
|
||||
| 02 - Prototype Evidence Layer | 2/2 | 8 min | 4.0 min/plan |
|
||||
| 03 - Core Evidence Layers | 6/6 | 52 min | 8.7 min/plan |
|
||||
| 04 - Scoring Integration | 3/3 | 10 min | 3.3 min/plan |
|
||||
| 05 - Output & CLI | 2/3 | 9 min | 4.5 min/plan |
|
||||
| 05 - Output & CLI | 3/3 | 12 min | 4.0 min/plan |
|
||||
|
||||
**Recent Plan Details:**
|
||||
| Plan | Duration | Tasks | Files |
|
||||
|------|----------|-------|-------|
|
||||
| Phase 03 P06 | 13 min | 2 tasks | 10 files |
|
||||
| Phase 04 P01 | 4 min | 2 tasks | 4 files |
|
||||
| Phase 04 P02 | 3 min | 2 tasks | 4 files |
|
||||
| Phase 04 P03 | 3 min | 2 tasks | 4 files |
|
||||
| Phase 05 P01 | 4 min | 2 tasks | 5 files |
|
||||
| Phase 05 P02 | 5 min | 2 tasks | 6 files |
|
||||
| Phase 05 P03 | 3 min | 2 tasks | 3 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -124,6 +124,10 @@ Recent decisions affecting current work:
|
||||
- [05-02]: Graceful degradation (individual plot failures don't block batch generation)
|
||||
- [05-02]: Dual-format reproducibility reports (JSON machine-readable + Markdown human-readable)
|
||||
- [05-02]: Optional validation metrics in reproducibility reports (report generates whether or not validation provided)
|
||||
- [05-03]: Report command follows established CLI pattern (config load, store init, checkpoint, steps, summary, cleanup)
|
||||
- [05-03]: Configurable tier thresholds via CLI flags (--high-threshold, --medium-threshold, --low-threshold, --min-evidence-high, --min-evidence-medium)
|
||||
- [05-03]: Skip flags for flexible iteration (--skip-viz, --skip-report) allow faster output generation
|
||||
- [05-03]: Graceful degradation for visualization and reproducibility report failures (warnings, not errors)
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -136,5 +140,5 @@ None yet.
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-11 - Phase 5 execution
|
||||
Stopped at: Plan 05-02 complete — visualization and reproducibility report modules implemented with tests
|
||||
Resume file: .planning/phases/05-output-cli/05-02-SUMMARY.md
|
||||
Stopped at: Plan 05-03 complete — CLI report command implemented with comprehensive CliRunner integration tests, Phase 5 complete
|
||||
Resume file: .planning/phases/05-output-cli/05-03-SUMMARY.md
|
||||
|
||||
Reference in New Issue
Block a user