gbanyan
|
6d2eddb6e8
|
Apply codex round-24 final cleanup: §III v5 + §IV v3.1
Codex round 24 returned Minor Revision: 3 Major CLOSED + 3 Major
PARTIAL + 4 Minor CLOSED + 2 Minor PARTIAL + 4 Editorial CLOSED
+ 1 Editorial OPEN. All 7 narrow residual fixes were §III-side
(I applied §IV fixes thoroughly in v3 but didn't mirror them to
§III v4).
§III v5 fixes:
1. Anonymisation leak repaired:
- "held-out-EY fold" -> "held-out-Firm-D fold" (L71)
- "Firms B (KPMG) and D (EY)" -> "Firms B and D" (L99)
2. K=3 LOOO weight drift 0.025 -> 0.023 at three sites
(L71, L115, L173 provenance table). Matches Script 37 max
C1 weight deviation and §IV v3 line 139.
3. §III-K positive-anchor paragraph cross-ref repaired:
"v3.x inter-CPA negative anchor (§III-J inherited; Table X)"
-> "(§IV-I, inheriting v3.20.0 §IV-F.1 Table X)".
4. §III-L five-way Likely-hand-signed band made inclusive:
"Cosine below the all-pairs KDE crossover threshold." ->
"Cosine at or below the all-pairs KDE crossover threshold
(cos <= 0.837)." Matches Script 42 and §IV:19.
5. Open question 1's pointer changed from current §IV-F (which
is Convergent Internal-Consistency Checks) to v3.20.0
Tables IX/XI/XII/XII-B + §IV-J descriptive proportions.
6. Provenance table: new row for full-dataset n=686 citing
Script 41 fulldataset_report.md.
7. Draft-note header refreshed: v3 -> v5; v4 -> v5 etc.;
"internal -- remove before submission" tag added.
§IV v3.1 fixes:
- Close-out checklist L262 stale "codex round 23" wording
updated to "rounds 21-24 and before partner Jimmy review".
- Close-out item 4 "in this v2" stale wording -> "in this v3".
- New item 5 added: internal author notes (this checklist +
§III cross-reference index + both files' draft-note headers)
are author working artefacts and should be moved/stripped
before partner / submission packaging.
Round 24 finding summary post-v5/v3.1:
Major: 3 CLOSED, 3 -> CLOSED (anonymisation + cross-ref +
table numbering note residuals)
Minor: 4 CLOSED, 2 -> CLOSED (weight drift 0.025 -> 0.023;
low-cosine inclusivity cos <= 0.837)
Editorial: 4 CLOSED, 1 PARTIAL (draft notes remain visible but
explicitly marked as internal-only "remove before
submission")
Phase 4 readiness: pending decision on whether to do one more
codex verification round (round 25) before drafting Abstract /
Intro / Discussion / Conclusion prose.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
2026-05-12 22:26:14 +08:00 |
|